Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. 1. Project Information: Project details, location, scope, and parties involved
2. 2. Purpose and Scope: Objectives of the method statement and extent of aluminum formwork works
3. 3. References: Applicable codes, standards, and specifications
4. 4. Definitions: Key terms and technical terminology used in the document
5. 5. Responsibilities: Roles and responsibilities of key personnel and stakeholders
6. 6. Resource Requirements: Required manpower, equipment, materials, and tools
7. 7. Material Specifications: Detailed specifications of aluminum formwork components
8. 8. Pre-Installation Requirements: Site preparation, storage, and handling procedures
9. 9. Installation Procedure: Step-by-step installation methodology
10. 10. Quality Control Measures: Inspection points, tolerances, and quality checks
11. 11. Safety Requirements: Safety measures, PPE requirements, and risk assessments
12. 12. Environmental Controls: Environmental protection measures and waste management
13. 13. Emergency Procedures: Response procedures for potential emergency situations
1. Special Weather Considerations: Additional measures for extreme weather conditions, used in exposed areas or during summer months
2. Interface Management: Procedures for managing interfaces with other trades, used in complex projects
3. Specialized Equipment Procedures: Details for special equipment usage, included when non-standard equipment is required
4. Night Work Procedures: Additional controls for night work, included when 24-hour operations are planned
5. High-Rise Specific Procedures: Additional requirements for high-rise construction, used for buildings over certain heights
1. Appendix A - Risk Assessment: Detailed risk assessment for aluminum formwork operations
2. Appendix B - Inspection Checklists: Quality control and safety inspection checklists
3. Appendix C - Equipment Specifications: Detailed specifications of major equipment
4. Appendix D - Drawing Register: List of relevant drawings and technical details
5. Appendix E - Training Records: Competency certificates and training records of key personnel
6. Appendix F - Product Technical Data: Manufacturer's specifications and data sheets
7. Appendix G - Emergency Contact List: Emergency contact details and escalation procedures
8. Appendix H - Permits and Certificates: Copies of relevant permits and certification documents
Find the exact document you need
Method Of Statement For Cable Termination
A technical procedure document for cable termination works in the UAE, compliant with local electrical regulations and safety standards.
Method Statement For Column Formwork
A technical document outlining methodology and safety requirements for column formwork operations in UAE construction projects, ensuring compliance with local regulations and international standards.
Method Statement For Demolition Of Concrete Slab
UAE-compliant technical document detailing methodology and safety procedures for concrete slab demolition works.
Aluminium Formwork Method Statement
A UAE-compliant technical procedure document for aluminum formwork operations in construction projects, adhering to local regulations and international standards.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
