Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. Document Control Information: Document reference number, revision history, and approval status
2. Project/Task Information: Details of the specific work being assessed, location, and duration
3. Scope of Works: Detailed description of all activities covered by this RAMS
4. Responsible Persons: Key personnel and their responsibilities in implementing the RAMS
5. Risk Assessment Methodology: Explanation of risk rating system and assessment criteria used
6. Hazard Identification: Comprehensive list of all potential hazards associated with the work
7. Risk Control Measures: Detailed preventive and protective measures for each identified hazard
8. Safe Work Procedures: Step-by-step method statement describing how work will be carried out safely
9. Equipment and PPE Requirements: List of all required safety equipment and personal protective equipment
10. Training Requirements: Required qualifications and training for personnel involved
11. Emergency Procedures: Response procedures for potential emergency situations
1. Environmental Impact Assessment: Required when work may have significant environmental impacts
2. Noise Assessment: Include when work involves high noise levels or noise-sensitive areas
3. Traffic Management Plan: Required when work affects public roads or vehicle movements
4. Confined Space Entry Procedures: Include when work involves confined space operations
5. Working at Height Procedures: Required for any work conducted above ground level
6. Hazardous Substance Controls: Include when work involves dangerous or toxic materials
7. COVID-19 Safety Measures: Required during pandemic conditions
8. Welfare Arrangements: Include for long-term or remote site works
1. Risk Assessment Matrix: Detailed risk scoring matrix and assessment criteria
2. Site Layout Plans: Maps and drawings showing work areas, access points, and emergency routes
3. Equipment Inspection Checklists: Forms for regular equipment safety checks
4. Emergency Contact Information: List of emergency contacts and response procedures
5. Toolbox Talk Records: Ƶ for daily safety briefings and attendance records
6. Permit to Work Forms: Required permits and authorization forms
7. Method Statement Briefing Record: Documentation of worker briefings on RAMS
8. Risk Assessment Review Log: Record of regular reviews and updates to the assessment
Find the exact document you need
Method Statement For Cutting Concrete Slab
A technical document outlining procedures and safety requirements for concrete slab cutting operations in compliance with Indian construction regulations.
Cofferdam Construction Method Statement
An Indian regulatory-compliant technical document detailing cofferdam construction methodology, safety measures, and environmental requirements.
Risk Assessment Method Statement
A comprehensive safety and risk management document that combines risk assessment with methodical work procedures, compliant with Indian health and safety regulations.
Scaffold Risk Assessment And Method Statement
An Indian regulation-compliant document detailing risk assessment and methodologies for safe scaffold operations, aligned with The Building and Other Construction Workers Act 1996.
Method Statement For Column Formwork
A technical document outlining methodology for column formwork operations in construction projects, compliant with Indian construction regulations and standards.
Method Statement For Demolition Of Concrete Slab
A technical document outlining procedures and safety protocols for concrete slab demolition in compliance with Indian construction regulations and safety standards.
Painting Risk Assessment And Method Statement
A mandatory safety and methodology document for painting operations in India, combining risk assessment with detailed work procedures under Indian safety regulations.
Aluminium Formwork Method Statement
A technical document outlining procedures and safety requirements for aluminum formwork systems in construction projects, compliant with Indian construction regulations and standards.
Risk Assessment And Swms
An Indian-compliant Risk Assessment and SWMS document outlining workplace hazards, safety procedures, and control measures for high-risk work activities.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
