Your data doesn't train Genie's AI
You keep IP ownership of your information
1. 1. Project Information: Details of the project location, scope, and client information
2. 2. Site Assessment: Detailed analysis of the concrete slab characteristics, surrounding environment, and existing conditions
3. 3. Risk Assessment: Comprehensive evaluation of potential hazards and risks associated with the demolition work
4. 4. Safety Measures: Detailed safety protocols, PPE requirements, and emergency procedures
5. 5. Demolition Methodology: Step-by-step breakdown of the demolition process, including equipment and techniques to be used
6. 6. Environmental Protection Measures: Procedures for dust control, noise reduction, and protection of surrounding areas
7. 7. Waste Management: Procedures for handling, sorting, and disposing of demolition waste
8. 8. Quality Control: Quality assurance measures and inspection procedures
9. 9. Site Organization: Layout of work zones, access routes, and storage areas
10. 10. Resource Requirements: List of required personnel, equipment, and materials
1. Temporary Works: Required when temporary support structures or protection measures are needed during demolition
2. Traffic Management Plan: Necessary when demolition affects public roads or requires vehicle movement planning
3. Noise Management Plan: Required in noise-sensitive areas or during restricted hours
4. Vibration Monitoring: Needed when demolition is near sensitive structures or equipment
5. Asbestos Management: Required if preliminary surveys indicate presence of asbestos in the concrete structure
6. Public Protection Measures: Necessary when work is conducted in public areas or near occupied buildings
1. Schedule A - Site Plans: Detailed site layouts showing work areas, access points, and safety zones
2. Schedule B - Risk Assessment Matrix: Detailed risk assessment tables and control measures
3. Schedule C - Equipment List: Comprehensive list of equipment with specifications and safety certificates
4. Schedule D - Emergency Contact Information: List of emergency contacts and response procedures
5. Appendix 1 - Method Statement Briefing Record: Document for recording worker briefings on the method statement
6. Appendix 2 - Daily Check Sheets: Forms for daily safety and equipment checks
7. Appendix 3 - Permits and Licenses: Copies of relevant permits and operator licenses
Construction
Demolition
Civil Engineering
Infrastructure
Real Estate Development
Industrial
Commercial Property
Urban Development
Operations
Health and Safety
Project Management
Engineering
Quality Assurance
Environmental Compliance
Site Operations
Risk Management
Project Manager
Site Manager
Health and Safety Officer
Demolition Supervisor
Construction Engineer
Environmental Compliance Officer
Quality Control Manager
Risk Assessment Specialist
Construction Site Coordinator
Demolition Equipment Operator
Find the exact document you need
Method Statement For Demolition Of Concrete Slab
A German-compliant technical document detailing procedures and safety measures for concrete slab demolition work, following German construction and safety regulations.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it