1. Project Information: Details of the project location, scope, client information, and concrete slab specifications
2. Site Assessment: Evaluation of site conditions, surrounding structures, utilities, and access/egress points
3. Resource Requirements: List of required personnel, equipment, tools, and materials for the demolition work
4. Risk Assessment: Identification and evaluation of potential hazards and risks associated with the demolition work
5. Control Measures: Detailed safety measures and controls to mitigate identified risks
6. Demolition Methodology: Step-by-step procedure for the demolition process, including preparation, execution, and completion phases
7. Environmental Management: Measures for dust control, noise management, and waste handling
8. Emergency Procedures: Emergency response plans and evacuation procedures
9. Quality Control: Inspection and verification procedures to ensure work meets required standards
10. Site Cleanup and Waste Disposal: Procedures for site clearance and proper disposal of demolition waste
1. Temporary Works: Details of any temporary supports, barriers, or structures required - include when demolition requires temporary structural support
2. Traffic Management Plan: Procedures for managing vehicle and pedestrian traffic - include when demolition affects public access areas
3. Noise Management Plan: Detailed noise control measures - include when working in noise-sensitive areas or during restricted hours
4. Vibration Monitoring: Procedures for monitoring and controlling vibration - include when working near sensitive structures
5. Public Protection Measures: Additional safety measures for public protection - include when working in populated areas
6. Utility Protection: Procedures for protecting active utilities - include when live services are present in work area
1. Schedule A - Site Layout Plan: Detailed site plan showing work areas, access points, and safety zones
2. Schedule B - Risk Assessment Matrix: Detailed risk assessment tables and matrices
3. Schedule C - Equipment List: Comprehensive list of equipment specifications and safety certificates
4. Schedule D - Personnel Qualifications: Certificates and qualifications of key personnel
5. Schedule E - Emergency Contact List: List of emergency contacts and response procedures
6. Schedule F - Inspection Checklists: Daily inspection and safety check forms
7. Schedule G - Environmental Monitoring Forms: Ƶ for recording environmental monitoring data
Construction
Civil Engineering
Industrial
Commercial Property
Infrastructure
Mining
Manufacturing
Urban Development
Property Development
Facilities Management
Health and Safety
Operations
Project Management
Quality Control
Environmental Compliance
Risk Management
Engineering
Site Operations
Demolition
Compliance
Project Manager
Site Manager
Health and Safety Manager
Construction Manager
Demolition Supervisor
Environmental Compliance Officer
Risk Assessment Specialist
Construction Safety Officer
Quality Control Manager
Civil Engineer
Structural Engineer
Environmental Engineer
Construction Superintendent
Operations Manager
Find the exact document you need
Contractor Method Statement
A detailed work methodology and safety procedure document compliant with Indonesian construction regulations, outlining specific construction activities and their safe execution methods.
Method Statement For Cutting Concrete Slab
A technical document outlining methodology and safety procedures for concrete slab cutting operations in compliance with Indonesian construction regulations.
Method Statement For Column Formwork
An Indonesian-compliant technical document detailing procedures and safety requirements for column formwork installation in construction projects.
Method Statement For Demolition Of Concrete Slab
A technical document compliant with Indonesian regulations that outlines the safe methodology for concrete slab demolition, including safety measures and environmental controls.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it