Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. Document Control: Document reference number, revision history, and approval status
2. Project Information: Project details, location, dates, and scope of works covered by this RAMS
3. Responsible Persons: Key personnel involved in the work, their roles, responsibilities, and contact information
4. Work Scope Description: Detailed description of the activities to be carried out under this RAMS
5. Risk Assessment: Systematic identification of hazards, risk evaluation, and existing control measures
6. Risk Matrix: Risk scoring methodology and risk classification system used
7. Control Measures: Detailed preventive and protective measures to be implemented
8. Method Statement: Step-by-step procedure for carrying out the work safely
9. Resource Requirements: Personnel, equipment, tools, and materials needed for the work
10. Training Requirements: Required qualifications, certifications, and training for personnel
11. PPE Requirements: Personal protective equipment required for different activities
12. Emergency Procedures: Emergency response plans and evacuation procedures
1. Environmental Impact Assessment: Required when work activities may have significant environmental impact
2. Noise Assessment: Required for activities involving high noise levels or in noise-sensitive areas
3. Traffic Management Plan: Required when work affects public roads or site traffic
4. Confined Space Entry: Required for any work in confined spaces
5. Working at Height: Required for activities conducted above ground level
6. Chemical Risk Assessment: Required when hazardous chemicals are involved in the work
7. Heavy Lifting Operations: Required for crane operations or heavy load handling
8. Hot Work Procedures: Required for welding, cutting, or other hot work activities
1. Risk Assessment Matrix: Detailed risk scoring tables and evaluation criteria
2. Site Layout Plan: Drawing showing work area, access points, and emergency facilities
3. Equipment Certificates: Copies of relevant equipment inspection and test certificates
4. Training Records: Copies of relevant personnel training and competency certificates
5. MSDS/SDS: Material Safety Data Sheets for any hazardous substances used
6. Emergency Contact List: List of emergency contacts and response team members
7. Toolbox Talk Topics: List of safety topics to be covered in daily briefings
8. Incident Report Forms: Template forms for reporting accidents or near misses
9. Daily Inspection Checklist: Ƶ for daily safety inspections and checks
Find the exact document you need
Method Statement For Cutting Concrete Slab
A technical document outlining methodology and safety procedures for concrete slab cutting operations in compliance with Malaysian construction and safety regulations.
Cofferdam Construction Method Statement
A Malaysian-compliant technical document outlining the methodology and safety procedures for cofferdam construction, following DOSH and CIDB requirements.
Method Statement For Column Formwork
A technical document outlining procedures and requirements for column formwork installation in Malaysian construction projects, complying with local regulations and standards.
Method Statement For Demolition Of Concrete Slab
A Malaysian-compliant technical document outlining safe and regulated procedures for concrete slab demolition works.
Risk Assessment And Method Statement
A Malaysian-compliant safety document combining risk assessment and detailed work procedures, meeting DOSH requirements for workplace safety management.
Aluminium Formwork Method Statement
A technical document detailing aluminum formwork installation procedures and safety requirements for construction projects in Malaysia, compliant with local regulations and standards.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
