Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. Document Control: Document version, revision history, and approval status
2. Project Information: Basic details about the project, location, client, and contractor
3. Scope of Works: Detailed description of the work activities to be carried out
4. Risk Assessment Methodology: Explanation of risk assessment approach, risk matrix, and scoring system
5. Hazard Identification: Comprehensive list of identified hazards associated with the work
6. Risk Assessment: Evaluation of risks, including likelihood and severity ratings
7. Control Measures: Detailed preventive and protective measures for each identified risk
8. Method Statement: Step-by-step description of how the work will be carried out safely
9. Resource Requirements: Personnel, equipment, and materials needed for the work
10. Personal Protective Equipment: Specific PPE requirements for different activities
11. Training Requirements: Required qualifications and training for personnel
12. Emergency Procedures: Response procedures for potential emergency scenarios
13. Environmental Controls: Measures to protect the environment and manage waste
1. Working at Heights: Include when work involves activities above ground level
2. Confined Space Entry: Include when work involves entering confined spaces
3. Hot Work Procedures: Include when work involves welding, cutting, or other hot work
4. Lifting Operations: Include when work involves crane operations or heavy lifting
5. Excavation Safety: Include when work involves trenching or excavation
6. Chemical Handling: Include when work involves hazardous substances
7. Noise Management: Include when work involves high noise levels
8. Traffic Management: Include when work affects public roads or site traffic
1. Risk Assessment Matrix: Detailed risk scoring matrix and assessment criteria
2. Site Layout Plan: Drawing showing work area, access points, and emergency facilities
3. Emergency Contact List: List of emergency contacts and responsible persons
4. Equipment Inspection Checklist: Forms for daily equipment and tool inspections
5. Permit to Work Forms: Ƶ for various work permits required
6. PPE Inspection Checklist: Forms for PPE checks and maintenance
7. Toolbox Talk Topics: List of safety topics for daily briefings
8. Incident Report Form: Template for reporting accidents and near-misses
9. Safety Data Sheets: MSDS for any hazardous materials used
10. Method Statement Drawings: Detailed drawings illustrating safe work methods
Find the exact document you need
Risk Assessment Policy
A Hong Kong-compliant Risk Assessment Policy establishing procedures for systematic risk identification, evaluation, and management across the organization.
Financial Guarantee
A Hong Kong law-governed agreement where a guarantor assumes responsibility for another party's financial obligations to a creditor.
Guest Speaker Contract
A Hong Kong law-governed agreement setting out terms and conditions for engaging a guest speaker for events or presentations.
Building Risk Assessment
A technical assessment document compliant with Hong Kong building safety regulations that identifies and evaluates building-related risks and provides mitigation strategies.
Risk Assessment Childcare
A Hong Kong-compliant risk assessment document for childcare facilities, evaluating potential hazards and outlining safety control measures under local regulations.
Site Security Assessment Report
A technical evaluation of site security measures and recommendations, prepared in accordance with Hong Kong security regulations and standards.
Bank Compliance Risk Assessment
A regulatory compliance risk assessment document for financial institutions operating in Hong Kong, aligned with HKMA requirements and local banking regulations.
Radiography Risk Assessment
A comprehensive radiography risk assessment document compliant with Hong Kong radiation safety regulations and healthcare standards.
Asset Based Risk Assessment
A Hong Kong law-governed document for systematic assessment and management of organizational asset risks, aligned with local regulatory requirements.
Assessment Matrix
A Hong Kong law-compliant framework document establishing structured criteria and methodologies for conducting systematic assessments and evaluations.
5x5 Risk Assessment
A structured 5x5 matrix risk assessment document for evaluating workplace hazards and safety concerns, compliant with Hong Kong safety regulations.
Bank Fraud Risk Assessment
A regulatory-compliant fraud risk assessment document for banking institutions in Hong Kong, analyzing and evaluating potential fraud risks across banking operations.
Audit Risk Assessment
A risk assessment document prepared under Hong Kong audit standards that evaluates and documents audit risks for client engagements.
Simple Risk Assessment
A structured workplace risk assessment document compliant with Hong Kong safety regulations, designed to identify and manage workplace hazards effectively.
Risk Assessment And Method Statement
A Hong Kong-compliant safety document combining risk assessment and detailed work procedures to ensure safe operation in accordance with local regulations.
Hot Work Risk Assessment
A Hong Kong-compliant risk assessment document for evaluating and controlling hazards associated with hot work operations, ensuring workplace safety and regulatory compliance.
Firm Risk Assessment
A structured evaluation of organizational risks and controls in accordance with Hong Kong regulatory requirements and business practices.
Demolition Invoice
A Hong Kong-compliant billing document for demolition services, including contractor details, project specifications, and itemized costs.
Vulnerability SLA
A Hong Kong law-governed agreement establishing service levels and requirements for vulnerability assessment services, including identification, reporting, and remediation of security vulnerabilities.
Landlord Ending Tenancy Letter
A Hong Kong-compliant formal notice from a landlord to terminate a tenancy agreement, specifying termination details and tenant requirements.
IT Risk Assessment Form
A Hong Kong-compliant IT Risk Assessment Form for evaluating technology-related risks and security controls under local regulations.
Risk Assessment Report
A structured risk assessment document compliant with Hong Kong regulations, analyzing potential hazards and providing risk mitigation strategies.
Security Risk Assessment Form
A structured security risk assessment document for evaluating organizational security risks and controls, compliant with Hong Kong regulations and security standards.
Hazard Report Form
A Hong Kong-compliant workplace hazard reporting form for documenting safety concerns and risk assessments under local occupational safety regulations.
Cheque Guarantee Letter
A Hong Kong law-governed bank document guaranteeing payment of specified cheque(s) to provide payment security in commercial transactions.
Pre Suit Settlement Agreement
A Hong Kong law-governed agreement that documents settlement terms and conditions between parties to resolve disputes prior to formal litigation.
Corporation Partnership Agreement
A Hong Kong law-governed agreement establishing a partnership between corporate entities, defining their rights, obligations, and operational framework.
Quotation Terms And Conditions
A Hong Kong law-governed document outlining the terms and conditions for providing quotations for goods or services, establishing clear commercial and legal parameters for business offers.
Business Resilience Plan
A comprehensive business resilience planning document aligned with Hong Kong regulations and business practices, providing frameworks for maintaining business continuity during disruptions.
Bounce House Liability Waiver
A Hong Kong law-governed liability waiver for bounce house operations, protecting operators while ensuring participant safety and parental consent.
Security Assessment And Authorization Policy
A Hong Kong-compliant policy document establishing procedures and requirements for security assessment and authorization processes within an organization.
Risk Assessment Remediation Plan
A Hong Kong law-governed document that outlines the structured approach to implementing risk mitigation measures and controls based on risk assessment findings.
Lateral Transfer Letter Request
A Hong Kong-compliant formal letter documenting an employee's internal transfer within an organization, including modified employment terms and conditions.
Site Safety Assessment Form
A formal safety assessment document for evaluating workplace hazards and implementing control measures in accordance with Hong Kong safety regulations.
Small Business Confidentiality Agreement
A Hong Kong law-governed confidentiality agreement tailored for small businesses, protecting sensitive information while ensuring practical usability.
Out Of Court Settlement Agreement
A Hong Kong law-governed agreement that documents the terms of settling a dispute outside of court proceedings.
Supplier Rebate Agreement
A Hong Kong law-governed agreement setting out terms for supplier rebates based on purchase volumes or other criteria.
Risk Assessment And Management Policy
A Hong Kong-compliant policy document establishing organizational risk assessment and management frameworks, aligned with local regulations and international best practices.
Barista Evaluation Form
A Hong Kong-compliant performance evaluation form for assessing barista skills, service quality, and operational compliance in food service establishments.
Internal Audit Engagement Letter
A Hong Kong-compliant engagement letter establishing the terms and scope of internal audit services, aligned with local regulatory requirements and professional standards.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
