Ƶ

Site Specific Risk Assessment And Method Statement Template for Germany

A comprehensive document compliant with German workplace safety regulations (Arbeitsschutzgesetz) that combines a detailed risk assessment with a methodical work procedure statement. It identifies site-specific hazards, evaluates associated risks, and establishes control measures while providing step-by-step instructions for safe work execution. The document ensures compliance with German federal safety requirements, relevant EU directives, and industry-specific standards, particularly the Betriebssicherheitsverordnung and Baustellenverordnung. It serves as both a planning tool and a practical guide for workplace safety management.

Typically:
i
This cost is based on prices provided by
6 legal services in your market.
With Ƶ:

£0

i
Generate and export your first
document completely free.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Get template free

Your data doesn't train Genie's AI

You keep IP ownership of your docs

4.6 / 5
4.6 / 5
4.8 / 5

What is a Site Specific Risk Assessment And Method Statement?

The Site Specific Risk Assessment And Method Statement (RAMS) is a crucial document required under German workplace safety legislation, particularly the Arbeitsschutzgesetz (ArbSchG) and related regulations. It is mandatory for most construction and high-risk industrial activities in Germany, combining risk evaluation with detailed work procedures. The document must be prepared before work commencement and updated when conditions change. It includes comprehensive hazard identification, risk evaluation, control measures, and step-by-step work procedures, all tailored to specific site conditions. The RAMS ensures compliance with German federal and state safety requirements, relevant EU directives, and industry standards while providing practical guidance for work execution. It serves as a key reference for all parties involved in the work, from management to site workers, and forms part of the site's safety documentation system.

What sections should be included in a Site Specific Risk Assessment And Method Statement?

1. Document Control: Document reference numbers, revision history, and approval status

2. Project Information: Site address, project description, client details, and key contacts

3. Scope of Works: Detailed description of work activities covered by this assessment

4. Risk Assessment Methodology: Explanation of risk rating system and assessment criteria used

5. Site-Specific Hazards: Identification and assessment of hazards specific to the site location

6. Work Activity Risk Assessment: Detailed assessment of risks associated with each work activity

7. Control Measures: Specific measures to minimize identified risks, including PPE requirements

8. Method Statement: Step-by-step procedure for carrying out the work safely

9. Emergency Procedures: Site-specific emergency response plans and evacuation procedures

10. Training Requirements: Required qualifications and training for personnel involved

11. Monitoring and Supervision: Details of how work will be supervised and safety measures monitored

12. Declaration: Signatures of responsible persons and confirmation of understanding

What sections are optional to include in a Site Specific Risk Assessment And Method Statement?

1. Environmental Impact Assessment: Required when work activities may have significant environmental implications

2. Noise Assessment: Include when works involve high noise levels or noise-sensitive areas

3. Traffic Management Plan: Required when works affect vehicle or pedestrian traffic flow

4. Confined Space Entry: Include for any works in confined spaces as defined by BetrSichV

5. Working at Height: Required when activities involve work at height as per BGR/GUV-R 193

6. Hazardous Substances: Include when works involve use of materials covered by GefStoffV

7. Specialist Equipment Operations: Required when using complex or high-risk machinery

8. Permit to Work Systems: Include for high-risk activities requiring specific authorization

9. COVID-19 Measures: Include current pandemic-related safety measures if still relevant

What schedules should be included in a Site Specific Risk Assessment And Method Statement?

1. Site Layout Plan: Marked-up drawings showing work areas, access routes, and emergency facilities

2. Risk Assessment Matrix: Detailed risk scoring matrices and assessment criteria

3. PPE Requirements Chart: Visual guide to required personal protective equipment

4. Emergency Contact List: Complete list of emergency contacts and responsible persons

5. Equipment Certificates: Copies of relevant equipment inspection and certification documents

6. Training Records: Certificates and qualifications of key personnel

7. COSHH Data Sheets: Safety data sheets for any hazardous substances used

8. Toolbox Talk Records: Documentation of safety briefings and worker acknowledgments

9. Incident Report Forms: Blank forms for reporting accidents or near misses

10. Method Statement Drawings: Technical drawings illustrating safe working methods

Authors

Alex Denne

Head of Growth (Open Source Law) @ Ƶ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents

Jurisdiction

Germany

Publisher

Ƶ

Cost

Free to use

Find the exact document you need

Executive Summary Risk Assessment

A German law-compliant executive summary document outlining key organizational risks, control effectiveness, and strategic risk mitigation recommendations.

Download

Task Risk Assessment Matrix

A German law-compliant risk assessment tool that systematically evaluates and controls workplace hazards, aligned with Arbeitsschutzgesetz requirements.

Download

RFP Risk Assessment

A German law-compliant risk assessment document for RFP processes, analyzing potential risks and providing mitigation strategies in accordance with German procurement regulations.

Download

Project Risk Assessment Process

A comprehensive project risk assessment framework compliant with German regulations and industry standards, providing structured methodology for risk identification and management.

Download

Project Assessment Matrix

A German law-compliant framework for systematic project evaluation and assessment, incorporating local regulatory requirements and business practices.

Download

Audit Risk Assessment Matrix

A structured framework for audit risk assessment and evaluation, compliant with German auditing standards and regulations.

Download

Risk Assessment For Grass Cutting And Strimming

German-compliant risk assessment document for grass cutting and strimming operations, addressing safety measures and regulatory requirements under Arbeitsschutzgesetz.

Download

Coal Mining Risk Assessment Report

A technical assessment report under German mining law that evaluates and addresses risks associated with coal mining activities at a specific site, providing recommendations for risk mitigation.

Download

Site Security Assessment Report

A German-law compliant technical evaluation of a site's security measures, vulnerabilities, and recommended improvements, following BSI guidelines and local regulations.

Download

Threat And Hazard Identification And Risk Assessment Guide

A comprehensive guide for workplace threat and hazard assessment compliant with German safety regulations and EU directives.

Download

Cybersecurity Risk Assessment Matrix

A German-law compliant framework for systematic evaluation and documentation of organizational cybersecurity risks, aligned with IT-Sicherheitsgesetz 2.0 and GDPR requirements.

Download

Supplier Security Assessment Questionnaire

A German law-compliant security assessment questionnaire for evaluating suppliers' security controls and regulatory compliance under German and EU regulations.

Download

Vendor Risk Assessment Questionnaire

German law-compliant vendor risk assessment questionnaire for evaluating third-party risks across multiple dimensions including security, data protection, and operational compliance.

Download

Baseline Risk Assessment

A mandatory workplace safety document under German law that identifies, evaluates, and provides control measures for workplace hazards and risks.

Download

Vulnerability Assessment Matrix

A German-compliant security assessment document that evaluates and documents system vulnerabilities, risks, and recommended security measures in accordance with BSI standards and EU regulations.

Download

Hazard Identification Form

A legally mandated German workplace safety document for systematic hazard identification and risk assessment, complying with Arbeitsschutzgesetz requirements.

Download

Procurement Risk Assessment Matrix

A structured risk assessment tool for procurement processes, compliant with German and EU procurement regulations.

Download

Scaffold Risk Assessment And Method Statement

A German-compliant safety and methodology document for scaffolding operations, combining risk assessment and detailed work procedures under German and EU safety regulations.

Download

Tile Manual Handling Risk Assessment

A German-compliant risk assessment document for evaluating and managing hazards associated with manual tile handling in workplace settings.

Download

Site Specific Risk Assessment And Method Statement

A German-compliant safety document combining risk assessment and detailed work procedures, meeting Arbeitsschutzgesetz requirements for site-specific hazard control and safe work execution.

Download

Compliance Risk Assessment Questionnaire

A German law-compliant questionnaire for assessing organizational compliance risks and control effectiveness, meeting BaFin and other regulatory requirements.

Download

Manual Handling Risk Assessment Tool

A German law-compliant risk assessment tool for evaluating and managing manual handling operations risks in the workplace, aligned with ArbSchG and LasthandhabV requirements.

Download

Manual Handling Assessment Chart

A German-compliant risk assessment tool for evaluating and managing manual handling operations risks under German workplace safety regulations.

Download

Lift Plan Risk Assessment

A German-compliant risk assessment document for lifting operations that evaluates safety aspects and ensures regulatory compliance with BetrSichV and DGUV requirements.

Download

Financial Statement Risk Assessment

A German law-compliant assessment document that evaluates and documents financial statement risks and internal control effectiveness, aligned with HGB and KonTraG requirements.

Download

Criticality Assessment Matrix

A German law-compliant framework for evaluating and categorizing organizational assets and processes based on their criticality levels, aligned with BSI standards and IT security requirements.

Download

Business Risk Assessment Questionnaire

A German law-compliant business risk assessment questionnaire for systematic evaluation and documentation of company-wide risks under German regulatory requirements.

Download

Environmental Risk Assessment Matrix

A German law-compliant environmental risk assessment matrix for systematic evaluation and management of environmental risks under German federal and EU regulations.

Download

Painting Risk Assessment And Method Statement

A German-compliant safety and methodology document for painting operations, addressing risk assessment and work procedures under German occupational safety laws.

Download

Summary Of Risk Assessment Report

A legally-required summary document under German law that outlines workplace hazards, risk evaluations, and safety measures based on a comprehensive risk assessment process.

Download

Slip Risk Assessment Report

A technical assessment document compliant with German workplace safety regulations that evaluates slip hazards and provides risk mitigation recommendations.

Download

Workplace Risk Assessment Report

A legally mandated German workplace safety document that evaluates occupational hazards and establishes necessary control measures under the Arbeitsschutzgesetz.

Download

Manual Lifting Risk Assessment

A German regulatory-compliant assessment document that evaluates risks associated with manual handling operations and establishes safety control measures.

Download

Respiratory Hazard Assessment Form

A German regulatory-compliant document for assessing and managing workplace respiratory hazards under the Gefahrstoffverordnung framework.

Download

Manual Handling Assessment Form

A standardized form for assessing manual handling risks and compliance with German workplace safety regulations (LasthandhabV).

Download

Initial Project Risk Assessment

A German law-compliant document that identifies, analyzes, and proposes mitigation measures for potential project risks, adhering to German safety and regulatory requirements.

Download

Fire Safety Assessment Report

A technical evaluation of building fire safety compliance and recommendations under German fire safety regulations and standards.

Download

Pre Task Risk Assessment

A German-compliant safety document for systematic hazard identification and risk control before task execution, following Arbeitsschutzgesetz requirements.

Download

IT Security Risk Assessment Report

A German law-compliant assessment report analyzing IT security risks, compliance status, and recommended security measures in accordance with BSI standards and EU regulations.

Download

Health Hazard Evaluation Form

A German-compliant workplace health hazard assessment document for identifying, evaluating, and controlling occupational health risks under the Arbeitsschutzgesetz framework.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it