Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. Document Control: Document revision history, distribution list, and approval signatures
2. Project Information: Project details, location, scope of works, and key stakeholders
3. Site Description: Detailed description of the work site, access/egress points, and surrounding environment
4. Risk Assessment: Identification and evaluation of all potential hazards, risk ratings, and control measures
5. Method Statement: Step-by-step description of work activities, sequence, and safety controls
6. Resource Requirements: Personnel, equipment, materials, and PPE required for the work
7. Training Requirements: Required certifications, qualifications, and specific training needs
8. Safety Controls: Specific safety measures, permits required, and control procedures
9. Environmental Controls: Environmental protection measures and waste management procedures
10. Emergency Procedures: Emergency response plans, first aid arrangements, and emergency contacts
1. Specialized Equipment Operations: Detailed procedures for specialized equipment use, required when project involves complex machinery or high-risk equipment
2. Hot Works Procedures: Specific controls for hot works, required when welding or hot cutting is involved
3. Confined Space Entry: Procedures for confined space work, required when work involves entering confined spaces
4. Working at Height: Additional controls for elevated work, required for activities above 2 meters
5. Night Work Procedures: Special considerations for night work, required when work is conducted during darkness
6. Traffic Management Plan: Vehicle and pedestrian management procedures, required when work affects traffic flow
7. Noise Management: Noise control measures, required for activities generating significant noise
8. Lifting Operations: Specific procedures for crane and lifting operations, required when conducting lifts
1. Risk Assessment Matrix: Detailed risk evaluation criteria and scoring system
2. Site Layout Plans: Drawings showing work areas, access routes, and safety facilities
3. Emergency Contact List: List of emergency numbers and key personnel contacts
4. PPE Requirements Chart: Matrix of required PPE for different activities
5. Permit to Work Forms: Ƶ for various work permits required
6. Equipment Inspection Checklists: Daily/weekly equipment inspection forms
7. Training Records: Copies of relevant training certificates and competency records
8. Safety Data Sheets: SDS for hazardous materials to be used
9. Toolbox Talk Topics: List of daily safety briefing subjects
10. Incident Report Forms: Ƶ for reporting accidents and near-misses
Find the exact document you need
Method Statement For Cutting Concrete Slab
A detailed procedural document for concrete slab cutting operations in Qatar, complying with QCS and local HSE regulations.
Method Statement And Risk Assessment For Landscaping
A Qatar-compliant method statement and risk assessment document for landscaping operations, detailing safety procedures and work methodologies.
Scaffold Risk Assessment And Method Statement
A mandatory safety document under Qatar law that details risk assessment and methodologies for scaffold operations, ensuring compliance with local construction and safety regulations.
Site Specific Risk Assessment And Method Statement
A mandatory safety planning document under Qatar law that combines site-specific risk assessment with detailed work procedures and control measures for construction and industrial projects.
Method Statement For Column Formwork
A technical procedure document for column formwork operations in Qatar, complying with QCS 2014 and local construction regulations.
Method Statement For Demolition Of Concrete Slab
A comprehensive method statement for concrete slab demolition operations in Qatar, outlining safety procedures and regulatory compliance requirements.
Painting Risk Assessment And Method Statement
A Qatar-compliant document detailing risk assessment and safe working procedures for painting operations, ensuring adherence to local HSE regulations and labor laws.
Method Statement And Risk Assessment For Excavation
A technical and safety compliance document required under Qatar law that details excavation methodology and risk assessment procedures.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
