Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. Project Information and Scope: Details of the project, location, client, principal contractor, and scope of scaffolding work
2. Responsible Persons: List of key personnel including scaffold supervisor, safety officer, and competent persons with their roles and contact information
3. Site Details and Access: Description of site conditions, access points, restrictions, and environmental considerations
4. Risk Assessment: Systematic identification and evaluation of potential hazards, likelihood and severity of risks, and risk ratings
5. Control Measures: Detailed preventive and protective measures to mitigate identified risks
6. Method Statement: Step-by-step procedure for scaffold erection, modification, and dismantling
7. Equipment and Materials: Specifications of scaffolding components, tools, and safety equipment to be used
8. Personal Protective Equipment: Required PPE for different activities and proper usage guidelines
9. Emergency Procedures: Response procedures for various emergency scenarios and rescue plans
10. Training Requirements: Necessary qualifications and training for personnel involved in scaffolding work
11. Inspection and Maintenance: Schedule and procedures for regular scaffold inspection and maintenance
1. Weather Conditions Protocol: Include when working in areas with severe weather conditions or specific weather-related risks
2. Public Protection Measures: Required when scaffolding work is conducted in public areas or near occupied buildings
3. Special Access Requirements: Include when non-standard access methods or equipment are needed
4. Load Calculations: Required for complex or heavily loaded scaffold structures
5. Environmental Protection Measures: Include when working in environmentally sensitive areas or when specific environmental controls are needed
6. Interface with Other Works: Required when scaffold work needs to coordinate with other concurrent construction activities
7. Night Work Procedures: Include when scaffolding work needs to be conducted during night hours
1. Schedule A - Risk Assessment Matrix: Detailed risk assessment scoring matrix and evaluation criteria
2. Schedule B - Scaffold Inspection Checklist: Standard forms for daily, weekly, and post-modification scaffold inspections
3. Schedule C - Equipment Register: List of all scaffolding equipment with inspection dates and certification details
4. Schedule D - Training Records: Copies of relevant training certificates and competency records
5. Schedule E - Emergency Contact List: List of emergency contacts and response team members
6. Schedule F - Site Layout Plan: Drawings showing scaffold locations, access points, and safety features
7. Appendix 1 - Technical Drawings: Detailed scaffold design drawings and specifications
8. Appendix 2 - Manufacturer's Guidelines: Relevant equipment manufacturer instructions and specifications
9. Appendix 3 - Permits and Licenses: Copies of required permits, licenses, and authorizations
Find the exact document you need
Planning And Risk Assessment In Auditing
A Malaysian-compliant audit planning and risk assessment framework aligned with local regulations and international auditing standards.
Fire Risk Assessment Policy
A policy document outlining fire risk assessment procedures and requirements in compliance with Malaysian fire safety regulations and BOMBA guidelines.
IT Risk Assessment Matrix
A Malaysian-compliant IT Risk Assessment Matrix for systematic evaluation and management of IT-related risks, aligned with local regulations and international standards.
Hazard And Risk Assessment Form
A Malaysian-compliant workplace safety document for systematic hazard identification, risk assessment, and control measure implementation as required by DOSH regulations.
Field Hazard Assessment Form
A Malaysian regulatory-compliant form for assessing and documenting workplace hazards in field operations, aligned with DOSH requirements and OSH Act 1994.
Risk Assessment Policy
A Malaysian-compliant policy document establishing procedures and frameworks for organizational risk assessment and management.
Client Risk Assessment Questionnaire
A Malaysian-compliant questionnaire for assessing client risk profiles and investment suitability in accordance with local financial regulations.
Risk Assessment Matrix Oil And Gas
A structured risk assessment framework for oil and gas operations in Malaysia, aligned with local regulations and industry standards.
Quality Risk Assessment SOP
A Standard Operating Procedure for quality risk assessment processes compliant with Malaysian pharmaceutical regulations and GMP guidelines.
Hazard Assessment Process
A Malaysian-compliant framework document for systematic workplace hazard identification, assessment, and control procedures in accordance with DOSH guidelines.
Risk Assessment Letter
A formal risk evaluation document compliant with Malaysian regulations that identifies, analyzes, and provides mitigation strategies for business-related risks.
Risk Assessment Document Software Development
A risk assessment framework for software development projects compliant with Malaysian legislation and industry standards.
Plant And Equipment Risk Management Form
A Malaysian-compliant risk management form for systematic assessment and control of industrial plant and equipment hazards, aligned with DOSH requirements.
Electrical Design Risk Assessment
A Malaysian-compliant technical assessment document that identifies and addresses risks in electrical design installations, following Energy Commission requirements and national safety standards.
E Signature Risk Assessment
A risk assessment document for e-signature implementation in Malaysia, analyzing legal compliance, technical security, and operational risks under Malaysian law.
Activity Based Risk Assessment Form Mom
A Malaysian regulatory document for systematic workplace risk assessment and control measures, compliant with DOSH requirements.
Project Assessment Matrix
A structured project evaluation framework compliant with Malaysian regulations, providing comprehensive criteria for systematic project assessment and decision-making.
Risk Assessment For Grass Cutting And Strimming
Malaysian-compliant risk assessment document for grass cutting and strimming operations, aligned with OSH Act 1994 requirements.
Threat And Hazard Identification And Risk Assessment Guide
A Malaysian-compliant guide for systematic workplace hazard identification and risk assessment, aligned with DOSH requirements.
Supplier Security Assessment Questionnaire
A Malaysian-compliant security assessment tool for evaluating supplier security controls and regulatory compliance under Malaysian law.
Baseline Risk Assessment
A mandatory workplace safety assessment document under Malaysian law that identifies and evaluates occupational hazards and control measures.
Vulnerability Assessment Matrix
A Malaysian-compliant security assessment framework for identifying and evaluating system vulnerabilities and providing remediation recommendations.
Method Statement And Risk Assessment For Landscaping
A Malaysian-compliant method statement and risk assessment document detailing safe landscaping procedures and hazard controls.
Hazard Identification Form
A Malaysian regulatory compliance document for systematic workplace hazard identification and assessment under DOSH guidelines.
Procurement Risk Assessment Matrix
A structured risk assessment tool for procurement activities in Malaysia, ensuring regulatory compliance and effective risk management in procurement processes.
Scaffold Risk Assessment And Method Statement
A Malaysian-compliant safety document combining risk assessment and detailed work procedures for safe scaffolding operations under DOSH regulations.
Tile Manual Handling Risk Assessment
A Malaysian-compliant risk assessment template for tile manual handling operations, aligned with DOSH guidelines and local safety regulations.
Preliminary Risk Assessment Audit
A Malaysian-compliant preliminary risk assessment audit document that evaluates organizational hazards and provides risk control recommendations under local safety regulations.
Pre Tender Risk Assessment
A Malaysian jurisdiction document for evaluating and analyzing risks associated with tender participation, ensuring compliance with local procurement requirements.
Compliance Risk Assessment Questionnaire
A comprehensive compliance risk assessment tool aligned with Malaysian regulatory requirements, helping organizations evaluate their compliance framework and identify potential risks.
Manual Handling Risk Assessment Tool
A comprehensive risk assessment tool for manual handling operations, compliant with Malaysian safety regulations and DOSH guidelines.
Manual Handling Assessment Chart
A Malaysian-compliant risk assessment tool for evaluating manual handling operations under DOSH guidelines.
Emergency Preparedness Risk Assessment
A Malaysian-compliant emergency risk assessment document that evaluates potential hazards and establishes preparedness measures for organizations.
Document Control Risk Assessment
A Malaysian-compliant risk assessment framework for evaluating and managing document control risks within organizations, aligned with local regulations and best practices.
Criticality Assessment Matrix
A Malaysian-compliant framework for assessing and categorizing business-critical elements and associated risks, aligned with local regulations and international standards.
Environmental Risk Assessment Matrix
A structured framework for assessing and managing environmental risks in Malaysian business operations, aligned with local environmental regulations and standards.
IT Risk Assessment Policy
A comprehensive IT risk assessment framework aligned with Malaysian regulations and industry best practices for systematic evaluation and management of technology risks.
Generic Risk Assessment
A Malaysian-compliant risk assessment document for systematic evaluation of workplace hazards and control measures under local safety regulations.
Security Assessment Report
A Malaysian-compliant security assessment report detailing organizational security vulnerabilities, risks, and remediation recommendations.
Risk Assessment Report
A Malaysian regulatory compliance document that assesses workplace hazards and risks, providing control measures and action plans under DOSH guidelines.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
