Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. Document Control: Document reference number, revision history, and approval status
2. Project Information: Project details, location, client information, and scope of scaffolding work
3. Responsible Persons: Names and contact details of key personnel including site supervisor, safety officer, and competent scaffold inspector
4. Scope of Work: Detailed description of scaffolding activities, type of scaffold, and intended use
5. Risk Assessment: Systematic assessment of all potential hazards, likelihood and severity ratings, and risk level determination
6. Control Measures: Specific measures to mitigate identified risks, including engineering controls, PPE requirements, and administrative controls
7. Method Statement: Step-by-step procedure for scaffold erection, modification, and dismantling
8. Equipment and Materials: List of required scaffolding components, tools, and equipment including specifications and quantity
9. Personnel Requirements: Required qualifications, training, and competencies for workers involved in scaffolding operations
10. Inspection and Monitoring: Requirements and frequencies for scaffold inspection, including pre-use checks and periodic inspections
11. Emergency Procedures: Emergency response protocols, evacuation procedures, and rescue plans
1. Environmental Considerations: Required when scaffolding work may impact environmental aspects or when working in environmentally sensitive areas
2. Confined Space Procedures: Required when scaffolding involves work in confined spaces
3. Interface with Other Activities: Required when scaffolding work interfaces with other construction activities or trades
4. Night Work Procedures: Required when scaffold activities are planned during night hours
5. Hot Work Procedures: Required when scaffolding involves or is near hot work activities
6. Specialized Access Requirements: Required when unusual or complex access arrangements are needed
1. Risk Assessment Matrix: Detailed risk assessment tables and matrices showing risk calculations
2. Site Layout Plan: Drawing showing scaffold locations, access points, and key site features
3. Scaffold Design Drawings: Technical drawings and specifications of scaffold configurations
4. Inspection Checklist: Standard forms for daily, weekly, and periodic scaffold inspections
5. Training Records: Certificates and qualifications of scaffold workers and supervisors
6. Emergency Contact List: List of emergency contacts and response team members
7. PPE Register: Details of required personal protective equipment and inspection records
8. Tool Box Talk Topics: Safety briefing contents specific to scaffold operations
Find the exact document you need
Method Statement For Cutting Concrete Slab
A detailed procedural document for concrete slab cutting operations in Qatar, complying with QCS and local HSE regulations.
Method Statement And Risk Assessment For Landscaping
A Qatar-compliant method statement and risk assessment document for landscaping operations, detailing safety procedures and work methodologies.
Scaffold Risk Assessment And Method Statement
A mandatory safety document under Qatar law that details risk assessment and methodologies for scaffold operations, ensuring compliance with local construction and safety regulations.
Site Specific Risk Assessment And Method Statement
A mandatory safety planning document under Qatar law that combines site-specific risk assessment with detailed work procedures and control measures for construction and industrial projects.
Method Statement For Column Formwork
A technical procedure document for column formwork operations in Qatar, complying with QCS 2014 and local construction regulations.
Method Statement For Demolition Of Concrete Slab
A comprehensive method statement for concrete slab demolition operations in Qatar, outlining safety procedures and regulatory compliance requirements.
Painting Risk Assessment And Method Statement
A Qatar-compliant document detailing risk assessment and safe working procedures for painting operations, ensuring adherence to local HSE regulations and labor laws.
Method Statement And Risk Assessment For Excavation
A technical and safety compliance document required under Qatar law that details excavation methodology and risk assessment procedures.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
