Your data doesn't train Genie's AI
You keep IP ownership of your docs
1. Document Control Information: Project details, document reference numbers, revision history, and approval status
2. Project Information: Site location, project description, client details, and main contractor information
3. Scope of Work: Detailed description of scaffolding works to be undertaken, including types of scaffolds and their intended use
4. Risk Assessment: Identification of potential hazards, risk evaluation, and control measures specific to scaffolding works
5. Personnel and Responsibilities: Details of key personnel involved, their roles, responsibilities, and required competencies
6. Equipment and Materials: Specifications of scaffolding components, tools, and safety equipment to be used
7. Method Statement: Step-by-step procedure for scaffold erection, modification, and dismantling
8. Safety Controls: Specific safety measures, PPE requirements, and emergency procedures
9. Inspection and Maintenance: Requirements for regular inspections, maintenance procedures, and documentation
10. Training Requirements: Specific training needs and competency requirements for workers involved
1. Environmental Controls: Additional environmental protection measures when working in sensitive areas or extreme weather conditions
2. Special Access Requirements: For projects requiring specific access arrangements or working at extreme heights
3. Interface with Other Activities: When scaffold work needs to coordinate with other concurrent construction activities
4. Night Work Provisions: Additional safety measures required for work during night hours
5. Confined Space Procedures: When scaffolding work involves confined space entry
6. Hot Work Procedures: When scaffolding work interfaces with welding or other hot work activities
1. Risk Assessment Matrix: Detailed risk evaluation tables and scoring methodology
2. Scaffold Inspection Checklist: Standard forms for daily, weekly, and handover inspections
3. Emergency Contact Information: List of emergency contacts and response procedures
4. PPE Requirements Chart: Detailed matrix of required personal protective equipment for different activities
5. Scaffold Tags and Signs: Examples and templates of required safety signage
6. Technical Drawings: Standard scaffold configurations and specific design drawings
7. Qualification Certificates: Copies of relevant training certificates and competency documents
8. Tool Box Talk Topics: List of safety topics for daily briefings
Find the exact document you need
Method Statement For Cable Glanding And Termination
A technical procedure document for cable glanding and termination operations that complies with Saudi Arabian electrical regulations and SASO standards.
Method Statement For Cutting Concrete Slab
A technical procedure document for concrete slab cutting operations, compliant with Saudi Arabian construction and safety regulations.
Slab Coring Method Statement
A technical document detailing concrete slab coring procedures and safety measures in accordance with Saudi Arabian construction regulations.
Method Statement And Risk Assessment For Landscaping
A detailed procedural and safety document for landscaping operations in Saudi Arabia, complying with local regulations and environmental conditions.
Scaffold Risk Assessment And Method Statement
A Saudi Arabian compliant safety document detailing risk assessment and methodology for safe scaffolding operations, adhering to local regulations and international standards.
Site Specific Risk Assessment And Method Statement
A Saudi Arabia-compliant safety document combining site-specific risk assessment and detailed work methodology to ensure safe project execution and regulatory compliance.
Method Statement For Column Formwork
A technical guide for column formwork installation and removal procedures in Saudi Arabian construction projects, ensuring compliance with local regulations and safety standards.
Method Statement For Demolition Of Concrete Slab
A technical document outlining methodology and safety procedures for concrete slab demolition, compliant with Saudi Arabian regulations and building codes.
Painting Risk Assessment And Method Statement
A Saudi Arabia-compliant risk assessment and method statement outlining safety procedures and operational guidelines for painting works.
Carpentry Risk Assessment And Method Statement
A safety and methodology document for carpentry operations in Saudi Arabia, ensuring compliance with Saudi Labor Law and construction safety regulations.
ұԾ’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ұԾ’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
We are ISO27001 certified, so your data is secure
Organizational security:
You retain IP ownership of your documents and their information
You have full control over your data and who gets to see it
