Ƶ

Scaffold Risk Assessment And Method Statement Template for Indonesia

A comprehensive safety documentation package prepared in accordance with Indonesian regulations, particularly Law No. 1 of 1970 on Occupational Safety and Minister of Manpower regulations. This document combines a detailed risk assessment identifying potential hazards associated with scaffolding work and a methodical statement outlining the safe procedures for scaffold erection, use, and dismantling. It serves as both a planning tool and a compliance document, ensuring all scaffolding activities meet Indonesian safety standards and providing clear guidelines for all involved parties.

Typically:
i
This cost is based on prices provided by
6 legal services in your market.
With Ƶ:

£0

i
Generate and export your first
document completely free.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Get template free

Your data doesn't train Genie's AI

You keep IP ownership of your docs

4.6 / 5
4.6 / 5
4.8 / 5

What is a Scaffold Risk Assessment And Method Statement?

The Scaffold Risk Assessment And Method Statement is a crucial safety document required under Indonesian occupational safety regulations for any project involving scaffolding work. This document is mandated by Law No. 1 of 1970 and subsequent regulations, serving as a comprehensive safety management tool that combines risk evaluation with detailed work procedures. It must be prepared before any scaffolding work commences and requires regular updates to reflect changing site conditions or work requirements. The document addresses specific Indonesian regulatory requirements while incorporating international best practices in scaffold safety management, making it essential for ensuring worker safety and legal compliance in construction and industrial projects throughout Indonesia.

What sections should be included in a Scaffold Risk Assessment And Method Statement?

1. Document Control Information: Contains document reference number, revision history, and approval status

2. Project Details: Specific information about the project, location, dates, and responsible parties

3. Scope of Work: Detailed description of scaffolding work to be undertaken

4. Risk Assessment: Systematic evaluation of all potential hazards, their likelihood, and severity

5. Control Measures: Detailed preventive and protective measures for identified risks

6. Method Statement: Step-by-step procedure for scaffold erection, use, and dismantling

7. Personnel Requirements: Qualifications, training requirements, and responsibilities of all involved personnel

8. Equipment and Materials: List of required scaffolding components, tools, and safety equipment

9. Safety Procedures: General safety rules and specific safety requirements for scaffold work

10. Emergency Procedures: Response procedures for potential emergency situations

11. Monitoring and Supervision: Details of inspection regimes and supervision requirements

What sections are optional to include in a Scaffold Risk Assessment And Method Statement?

1. Environmental Considerations: Required when work involves specific environmental risks or concerns

2. Special Access Requirements: Needed when complex access arrangements or restrictions exist

3. Interface with Other Activities: Include when scaffold work overlaps with other construction activities

4. Weather Contingency Plans: Required for external scaffolding in areas with severe weather conditions

5. Public Protection Measures: Necessary when scaffolding is erected in public areas

6. Temporary Works Design: Required for complex scaffold structures requiring engineering design

7. Local Authority Requirements: Include when specific local regulations or permits apply

What schedules should be included in a Scaffold Risk Assessment And Method Statement?

1. Schedule A - Risk Assessment Matrix: Detailed risk evaluation matrices and scoring systems

2. Schedule B - Inspection Checklist: Daily and weekly scaffold inspection forms

3. Schedule C - Training Records: Copies of relevant training certificates and competency records

4. Schedule D - Equipment Specifications: Technical specifications of scaffold components and safety equipment

5. Schedule E - Site Layout Plans: Drawings showing scaffold locations and access routes

6. Schedule F - Emergency Contact Details: List of emergency contacts and response procedures

7. Appendix 1 - Scaffold Tags System: Examples and procedures for scaffold tagging system

8. Appendix 2 - Toolbox Talk Contents: Safety briefing materials for daily team discussions

9. Appendix 3 - Relevant Legislation: Copies of applicable regulations and standards

Authors

Alex Denne

Head of Growth (Open Source Law) @ Ƶ | 3 x UCL-Certified in Contract Law & Drafting | 4+ Years Managing 1M+ Legal Documents

Jurisdiction

Indonesia

Publisher

Ƶ

Cost

Free to use

Find the exact document you need

On Site Risk Assessment

Professional on-site risk assessment agreement compliant with Indonesian safety regulations and workplace safety laws.

Download

Money Laundering Risk Assessment For Solicitors

An Indonesian law-compliant risk assessment framework for identifying and managing money laundering risks in legal practices.

Download

Kitchen Equipment Risk Assessment

A risk assessment document for kitchen equipment operations, ensuring compliance with Indonesian safety regulations and establishing safety protocols for commercial kitchen environments.

Download

E Authentication Risk Assessment

A technical assessment document evaluating electronic authentication risks and compliance requirements under Indonesian law.

Download

Crm Risk Assessment Matrix

An Indonesian-compliant risk assessment framework for evaluating and managing customer-related risks in financial institutions.

Download

Company Risk Assessment

A comprehensive risk assessment document compliant with Indonesian regulatory requirements, analyzing organizational risks and providing mitigation strategies.

Download

Equipment Criticality Assessment Matrix

A structured framework for evaluating equipment criticality and risk assessment in accordance with Indonesian safety regulations and SMK3 requirements.

Download

Risk Assessment Summary

A structured evaluation of organizational risks and mitigation strategies, compliant with Indonesian risk management regulations and safety standards.

Download

Young Worker Risk Assessment

An Indonesian law-compliant risk assessment document for evaluating and protecting young workers (ages 15-17) in the workplace.

Download

OHS Risk Assessment

An Indonesian regulatory-compliant workplace safety document that systematically assesses and addresses occupational hazards and risks under Government Regulation No. 50 of 2012 on SMK3.

Download

Residential Fire Risk Assessment

A technical assessment document evaluating fire safety risks in residential properties under Indonesian building safety regulations.

Download

Jsa Risk Assessment

A structured workplace safety assessment document that analyzes job-specific risks and control measures, complying with Indonesian safety regulations and SMK3 requirements.

Download

Risk Assessment Control Form

An Indonesian regulatory-compliant document for systematic workplace hazard identification, risk assessment, and control measure implementation.

Download

Confined Space Hazard Assessment

An Indonesian regulatory-compliant assessment document for identifying and controlling confined space hazards in accordance with national safety laws.

Download

Museum Risk Assessment

A comprehensive museum risk assessment document compliant with Indonesian cultural heritage and safety regulations, evaluating collection and public safety risks with mitigation recommendations.

Download

Fraud Risk Assessment For Banks

A regulatory-compliant fraud risk assessment document for Indonesian banking institutions, aligned with OJK and Bank Indonesia requirements.

Download

Credit Union Risk Assessment

An Indonesian-compliant risk assessment framework for credit unions, incorporating OJK regulatory requirements and comprehensive risk evaluation guidelines.

Download

Safety Assessment Form

An Indonesian-compliant workplace safety assessment document for systematic hazard identification and risk control, aligned with local safety regulations.

Download

Liquidity Risk Assessment

A regulatory-compliant liquidity risk evaluation document for financial institutions operating in Indonesia, aligned with OJK and Bank Indonesia requirements.

Download

Information Security Risk Assessment Report

A detailed assessment of information security risks and mitigation recommendations, aligned with Indonesian data protection and cybersecurity regulations.

Download

Infection Control Risk Assessment Form For (Construction)

An Indonesian-compliant risk assessment form for managing infection control during healthcare facility construction projects.

Download

Warehouse Fire Risk Assessment

A fire risk assessment document for warehouse facilities in Indonesia, ensuring compliance with national safety regulations while evaluating and mitigating fire hazards.

Download

Abc Risk Assessment

An anti-bribery and corruption risk evaluation document aligned with Indonesian regulatory requirements, assessing organizational risks and providing mitigation recommendations.

Download

Risk Assessment Executive Summary

An executive-level summary of organizational risks and mitigation strategies, compliant with Indonesian regulatory requirements and risk management frameworks.

Download

Severity Risk Assessment Matrix

An Indonesian-compliant risk assessment matrix framework for evaluating and categorizing operational risks according to their severity and likelihood.

Download

Risk Assessment SOP

Standard Operating Procedure for conducting workplace risk assessments in compliance with Indonesian safety regulations and government requirements.

Download

Security Risk Assessment Report

A comprehensive security risk evaluation document compliant with Indonesian regulations, assessing organizational security threats, vulnerabilities, and providing mitigation recommendations.

Download

Risk Assessment Report Of A Company

A comprehensive risk assessment document analyzing company-wide risks and mitigation strategies, compliant with Indonesian regulatory requirements.

Download

Hot Works Risk Assessment

An Indonesian-compliant risk assessment document for managing safety in hot works operations, including welding, cutting, and related heat-generating activities.

Download

Hazard Risk Assessment

A structured evaluation of operational hazards and risks, compliant with Indonesian safety regulations, providing risk analysis and mitigation recommendations.

Download

Cyber Security Risk Assessment Matrix

A structured cybersecurity risk assessment framework compliant with Indonesian regulations for identifying and evaluating organizational cyber risks.

Download

Building Risk Assessment

An Indonesian law-compliant assessment document evaluating building-related risks, safety compliance, and recommended mitigation measures under Law No. 28 of 2002 and related regulations.

Download

Personal Training Risk Assessment

An Indonesian-compliant risk assessment document for personal training services, outlining safety protocols and risk mitigation strategies in accordance with local regulations.

Download

Risk Assessment Document Software Development

A comprehensive software development risk assessment document compliant with Indonesian regulations, focusing on technical, operational, and security risk management.

Download

Participant Risk Assessment

An Indonesian-compliant risk assessment document analyzing participant risk profiles across multiple dimensions, meeting local regulatory requirements.

Download

Machine Guarding Risk Assessment

A technical assessment of machinery safety risks and guarding requirements compliant with Indonesian workplace safety regulations, providing recommendations for safety improvements.

Download

Latex Risk Assessment

An Indonesian-compliant workplace safety document assessing latex-related risks and establishing control measures under Law No. 1 of 1970.

Download

IT Security Assessment Report

A technical report detailing IT security assessment findings and recommendations, aligned with Indonesian cybersecurity regulations and standards.

Download

Application Security Risk Assessment

An Indonesian law-compliant agreement for conducting Application Security Risk Assessment, establishing assessment parameters and compliance requirements.

Download

Indoor Event Risk Assessment

An Indonesian-compliant risk assessment template for indoor events, incorporating national safety regulations and local building codes.

Download
See more related templates

ұԾ’s Security Promise

Genie is the safest place to draft. Here’s how we prioritise your privacy and security.

Your documents are private:

We do not train on your data; ұԾ’s AI improves independently

All data stored on Genie is private to your organisation

Your documents are protected:

Your documents are protected by ultra-secure 256-bit encryption

We are ISO27001 certified, so your data is secure

Organizational security:

You retain IP ownership of your documents and their information

You have full control over your data and who gets to see it